Welcome to Hamafza Management Website, We have management solution in all fields of Oil and Gas Industries
Mohammad Ali Talebi

Name:  Mohammad Talebi                                         

QUALIFICATIONS

 BE degree in Electrical Engineering, Bangalore University of India (1981) 

EMPLOYMENT HISTORY

June 2001 up to September 2012  Petropars Ltd

July 1997 up to May 2001             IOEC Offshore Engineering & Construction Company

July 1986 up to June 1997            NIOC National Iranian Oil Company

February 1982 up to June 1986     IRITEC Engineering and Construction Company, DENA Company  

Ministry of Energy                                                          

SUMMARY OF EXPERIENCE

Experienced as Vice President in Business Development, Country Manager, Project Director, Project Management, Construction Management, Offshore Director, Offshore Project Manager, Vessel Conversion Project Manager, Offshore Operation Manager in oil and gas industries  both onshore and offshore .

Business Development & Country Manager:

Business development in Latin American Countries and Africa and CIS Countries acting as Vice President of Company,

Country Manager in Latin America and Africa acting as Asset Manager,

Project Director Activities:

Acting as Project Director for oil and gas projects both onshore and offshore in extra heavy oil fields and natural gas field development,

Project Management Activities:

Acting as Project Manager for mega projects both onshore and offshore as well heavy lift vessel conversion to pipe layer,

Construction Manager Activities:

Construction activities of gas refinery, compressor stations including engineering, procurement, construction and commissioning etc

Operation Manager Activities:

Offshore operation including marine fleet, load out, transportation and installation, rehabilitation of offshore facilities etc.

Other Activities:

Member of BODs of Petropars UK Ltd,VENIROGC,Petrolera VenPersa,VCE representative in Madrid office.

Activities in the area of after sales sevices, R&D in area of mines industry and power generation etc.

EMPLOYMENT DETAIL 

2001 - 2012, April:       Petropars Limited

»  Vice President in Business Development and International Affairs

The related activities have been evaluation of Oil and Gas opportunities in South America/Africa and CIS Countries as well Neighboring Countries for possible participation of Company and the achievements were as follows,

-Extra heavy oil blocks  of Venezuela in Orinoco Oil Belt were studied by dedicated team of experts in technical, commercial and contractual both upstream and downstream and finally after comprehensive studies feasibility report including both technical and commercial, opportunities and possible risks   prepared and submitted to Company BODs for making decision for possible signature of participation agreement as partner for exploration and development.

-Gas blocks in Gulf of Venezuela were studied for possible exploration and production of natural gas and finally the preliminary evaluation report for possible opportunities and risks prepared and submitted to Company for decision making.

-The oil and gas blocks in Africa were studied in Countries like Sudan, Nigeria, Ghana and Angola and the evaluation report for possible participation and exploration submitted to Company BODs for decision making and finally the Company took percentage of share in one of oil fields in Angola and became the partner of Angola state oil company for exploration and production.

-The gas fields in Turkmenistan were studied both technically and commercially for possible exploration and production both upstream and downstream and the feasibility studies were submitted to Company BODs for making decision.

» Petropars Venezuela Branch Representative as Country Manager

The main activities have been, incorporation of Company Branch in Venezuela, mobilization of Branch Office in Caracas, defining the organization chart and mobilizing the experts from technical, commercial and contractual for evaluation of   the opportunities in Oil and Gas business in the Venezuela for possible participation of Company in development and operation as well as managed the day to day administration and operation of Company Branch Office and the achievements were as follows,

-Signature of joint quantification of extra heavy oil blocks in Venezuela for possible participation as partner of PDVSA for exploration and production.

- Signature of joint quantification natural gas blocks in Gulf of Venezuela for possible participation as partner of PDVSA for exploration and production.

»  Project Director of Petropars Projects in Venezuela

The main activities executed were, defining required organization chart, mobilizing the technical, commercial and contractual teams of expert for quantification studies in Extra Heavy Oil field of Venezuela in Orinoco Oil Belt for possible participation of Company as partner for production and upgrading of EHO to light oil and the main achievements were,

- Signature of quantification and evaluation of more than 6 blocks in Orinoco Oil Belt with PDVSA.

-Signature of quantification and evaluation of one gas block in Gulf of Venezuela with PDVSA.

» Project Director of Bid Boland Gas Project

The Project scope of work was construction of gas refinery with refining capacity of more than 36 MMCM per day of sour gas, storage facilities for gas condensate, pipe lines in both upstream and downstream for sour gas delivery to refinery, delivery of sweet gas to nearby sweet gas network, delivery of condensate to storage facilities.

Main activities executed have been mobilization of Project Office, defining the Project organization chart as per Project scope of work, mobilizing the experts needed as per Project plan etc and the main achievements were,

-Managing the tender of the Project sent to qualified bidders as per approved vendor lists of client, clarifications to bidders both technical and commercially by sending the circulars to all bidders etc

-Completion of tenders of this mega gas project and selection of consortium as EPC by technical and commercial evaluation of bidders based on defined criteria approved by the client.

-Signature of EPC contract by successful bidder.

- Site preparation activities were managed etc

»  Deputy Project Director of Petropars /Statoil Joint Venture

Petropars /Statoil JV were responsible for development of offshore part of South Pars phase 6,7 and 8 as Operator including the offshore facilities 3 jackets,3 topsides ,315 KM of subsea pipe lines  and drilling of more than 30 wells and the main achievements were ,

-Fabrication and installation of Project jackets.

-Fabrication and installation of Project topsides.

-Drilling more than 30 wells on jackets.

-Laying more than 300 KM of subsea pipe lines.

-Commissioning of offshore facilities etc

-Hand over of the facilities to client.

-Close up of the Project.

»  Offshore Project Manager of phases 6, 7, &8 South Pars gas Field

The main activities  have been related to mobilization of Project Office ,defining the Project organization chart as per Project schedule ,mobilizing the teams of experts from technical, planning,commercial,contractual ,administration, logistic etc  and the main achievements were,

-Preparing the ITB documents,

-Evaluation of qualified vendors,

-Preparing the vendor lists,

-Approval of vendors by client and Company BODs,

-Sending ITB to approved vendors,

-Managing bidders clarifications,

-Evaluation of technical and commercial of bidder’s proposals,

-Signature of EPC contracts for offshore facilities with two successful bidders, one for 3 jackets and the second one for 3 topsides and 3 pipe lines,

 1997- 2001: Iranian Offshore Engineering and Construction Company (IOEC)

»  Offshore Operation Manager

Responsible for mobilization of offshore operation team for installation of the South Pars Phase 1 jackets (SPD1, SPD2) as per defined plan the main activities and achievements were,

-Mobilization of crane barge for heavy lift,

-Mobilization of launch barge for load out of jacket,

-Mobilization of qualified offshore sub-contractors like diving, positioning, MWS,etc

- Mobilization of installation team on the crane barge for heavy lift,

-Mobilization of team on transportation barge,

-Mobilization of support vessels like AHT etc

-Launching the jacket in defined position by launch barge,

-Lifting the launched jacket by crane barge ,

-Positioning the jacket in defined location of sea bed,

-Fixing the jacket by first add ons,

-Welding the conductors and hammering to defined penetration depth,

-Completion of jacket installation,

-Demobilization of marine spread,

-Close up the project 

Responsible for Aboozar oil field development which were included installation of Jackets (A15-A19) in Abouzar Oil Field, removal of living quarter (LQ) of Aboozar oil field and installation of production platform  jacket and living quarter jacket  AB and LQ  ,the main activities and achievements were,

-Mobilization of crane barge including removal equipment for removal and installation of old and new jackets AB and LQ,

-Mobilization of transportation barge for load out of jacket,

-Mobilization of qualified offshore sub-contractors like diving, positioning, MWS,etc

- Mobilization of installation team on the crane barge for removal of old jackets and installation of new jackets,

-Mobilization of team on transportation barge,

-Mobilization of support vessels like AHT etc

-Lifting the jacket to defined position,

-Positioning the jacket in defined location of sea bed,

-Fixing the jacket by first add on,

-Welding the conductors and hammering to defined penetration depth,

-Completion of jacket installation,

-Demobilization of marine spread,

-Close up the project 

»  Offshore Department Director

Responsible for installation engineering, management of marine spread, offshore operation and installation activities the main achievements were,

-Installation of Phase 1 jackets,

-Installation of Abouzar oil field jackets,

-Removal and Abouzar oil field jackets,

-Conversion of AB-1200 to pipe layer etc

 »  Project Manager for Conversion of Aboozar – 1200

 

Responsible for feasibility study, engineering, procurement and conversion of Aboozar 1200 heavy lift barge to Derrick Lay Barge ,the main activities and achievements were,

-Preparing the feasibility studies for converting AB-1200 to pipe layer ,

-Conversion engineering by hiring the qualified sub-contractor,

-Managing the conversion activities by allocating team of experts in sub-contractor office,

-Ordering the conversion equipment

-Tendering the conversion activities in RFQ documents to qualified dry docks,

-Signature of contract with successful dry dock by evaluating technical and commercial of bidders,

-Supervision of conversion activities for AB-1200 modification as well as installation of equipment on board of AB-1200 like fire line, welding stations ,tentioners,fabrication of stinger etc

-Sea trial of vessel

-Close up of the Project,

» Project manager in IOEC- CCC Joint venture

Responsible for South Pars phase 1 project which was included EPCI of offshore pipe line (110km of 32” pipeline), SBM refurbishment and installation ,the main activities and achievement were,

-Mobilization of Project office,

-Mobilization of Project team as per project plan and schedule,

-Selection of installation engineering sub-contractor,

-Supervision of installation engineering,

-Supervision of SBM rehabilitation activities,

 -Ordering the pipe line,

-Selection of concrete coating sub-contractor,

-Selection of shore approach sub-contractor,

-Supervision of concrete coating activities,

-Selection of laying barge and transportation barge as well support vessels,

- Selection and mobilization of laying sub-contractor on lay barge ,

-Mobilization of transportation barge and load out of coated pipe lines ,

-Mobilization of lay barge with installation team and sub-contractors,

-Mobilization of support vessels,

-Laying the pipe line by positioning the lay barge starting from shore approach provided the shore approach activities have been already finished by shore approach sub-contractor ,

- Free span correction activities by sub-contractor,

-Hydro testing,

-dewatering etc

-SBM installation activities through sub-contractor,

-Demobilization of marine spread,

-Project close up

1986 - 1997:   National Iranian Oil Company

 » Gas Refinery Deputy Project Manager:

Responsible for construction and commissioning of refinery and hand over to client. The Kangan gas refinery is having 8 trains and the refining capacity is daily more than 110MMCM, the main activities and achievements were ,

-Supervision of construction activities through  sub-contractor including civil, mechanical, electrical, instrument etc by supervision team

-Fabrication engineering activities,

-Mechanical completion activities

-Pre commissioning activities,

-Commissioning of plant,

-Test run for 72 hours

-Hand over to client,

Project close up etc 

Installation and construction manager, responsible to manage the wellhead facilities, gathering and separation units, pipeline, housing projects, airport, roads storage facilities export for condensate.etc the main activities and achievements were ,

-Monitoring the projects installation and construction activities through project managers as per project schedule and defined budgets,

»  Member of Executive Committee of IGAT II Farash Band Gas  Compressor Station

Responsible for installation and commissioning of this station, the main activities and achievement were monitoring the activities through project manager in order to execute the project as per defined schedule and budget, commission of the station and hand over to client.

 » Project Manager of Feasibility Study for Export of Natural Gas to India by pipeline

This project was  defined for laying the pipe line for transportation of natural gas to India and Pakistan with capacity of 50 MMCM per day, the main activities and achievement were ,

-Feasibility studies for execution of pipe line offshore by sub-contractor (Mentor engineering, PLE and Sazeh.) 

 » Deputy to Execution Manager of Kangan Gas Refinery Natural Gas Projects.

The executive manager of KNGP was responsible for engineering , procurement , construction and commissioning of Kangan Gas Refinery consisting of 8 trains and utilities , 25 well head facilities , 7 gathering and separation units, housing projects with 7000 person capacity with all facilities , roads , pipeline , condensate storage and exporting facilities in Taheri ,the main activities and achievements were,

-Manage the sub projects activities through project managers,

-Manage the engineering activities of the projects through engineering department,

-Manage the procurement activities through procurement department,

-Manage the sub-contractors contract through contract department,

-Manage financial of the projects through financial department,

-Manage the human resources through human resource department,

-Liase with authorities in NIOC and NIGC for budget allocation of Projects,

-Liase with Ministry of Petroleum,NIGC for commissioning and hand over of the Projects ,

-Commissioning and hand over of the projects,

-Projects close up,  

1982 - 1986:   IRITEC, DENA, Ministry of Energy

Iran international engineering company (IRITEC)

This company was acting as engineering and supervision consultant in execution of Mubarake Steel Plant and Ahvaz Steel plant. Working R&D Manager and the main activities were doing R&D project with assistance of UNIDO for establishment of R&D institution for mineral activities.

 Dena Company

Acting as technical director for after sales services of Volvo heavy trucks and Nissan vehicle, the main activities and achievements were managing the organization for after sales sevices of Volvo heavy trucks through technical maintenance team and selling  the  spare parts  though qualified agents all over the Country .

Ministry of Energy

Working as expert in controlling the power plant projects in Gazvin, Isfahan and Ahvaz ,the main activities were supervising the power plant projects as per approved plan of Ministry of Energy.

LANGUAGE SKILL

English Fluent, Spanish Good, Persian Fluent 